
Plumbing decides whether a bathroom works. The right pipe routes, secure joints and proper waste falls prevent leaks, slow drains and noisy pipes. Done well, you never see it.
John handles bathroom plumbing as part of refits, renovations and installations, including fully concealed pipework. On one renovation every item in the room was moved and all of the plumbing was hidden in the walls.
Recent work
How it works
John checks the floor construction, joist direction and where the soil stack sits.
Pipe routes are planned alongside the layout and quoted clearly.
Supply and waste pipes are run and concealed before plastering and tiling.
Fittings are connected and isolation valves fitted.
Everything is tested for leaks, flow and drainage.
Good to know
Hot and cold feeds to taps, showers and toilets. The right pipe size helps flow and pressure, especially for showers.
Waste has to fall towards the drain at the right angle. Toilets connect to the soil stack, which limits how far they can move.
Pipes can run inside stud walls, in chases cut into masonry or under floors.
A valve on each fitting lets you turn off one item for maintenance without shutting down the house.
Questions
Get a quote
Send a quick enquiry and John will be in touch to arrange a time that suits you.
Related services