A full rebuild, managed as one job

A renovation goes further than swapping the suite. It is the chance to rethink the room. That might mean moving the toilet, putting the bath or shower somewhere better, changing a wall or a door, and hiding all the pipework.

John has completed full renovations across Mid Sussex that involved changing walls and doors, moving every item in the room and concealing all of the plumbing with no boxing in. Because he manages each trade himself, the structural, plumbing, electrical and finishing work all follow one plan.

Before anything is taken out, John helps you settle the layout.

A good fit for

  • Bathrooms with an awkward layout that wastes space
  • Older homes with tired or boxed in pipework
  • Changing walls, doors or where things sit
  • Homes being updated before moving in or selling
  • Rooms with floor movement or long running damp
10+Years fitting bathrooms
5.0Google rating
10/10Checkatrade score
£1mPublic liability insurance

Recent work

Finished by John's team

Full gallery

How it works

From the first visit to the handover

  1. Site visit and layout

    John checks walls, floors and pipe routes and talks through layout options with you.

  2. Quote and programme

    A clear quote and a staged plan covering structural, plumbing, electrical and finishing work.

  3. Strip out and structure

    Everything comes out, then wall changes, reinforcement and floor repairs where needed.

  4. First fix and finish

    Concealed plumbing and electrics, plastering, tiling and the new suite fitted.

  5. Final check

    Everything is tested and walked through with you.

Good to know

What John will talk you through

Moving the toilet, basin, bath or shower

Moving items means new supply and waste runs. The toilet has to reach the soil stack with the right fall, so John checks what is possible at the visit.

Changing or reinforcing walls

A small wall change can make room for a bigger shower or a better door position. Walls that carry a wall-hung toilet or basin may need strengthening.

Concealed plumbing

Pipes hidden in walls and floors look cleaner and make the room easier to clean. It has to be planned before plastering.

Floor repairs

Creaky or springy floors are put right during the renovation so new tiles and grout do not crack.

Bath, shower or both

Some people keep a bath and add a separate shower. Others swap the bath for a walk-in shower. It depends on the room and who uses it.

Period and modern homes

Older houses often have uneven walls and older pipework. Newer homes can have tighter rooms. The standard of finish is the same.

Questions

Bathroom Renovation questions

Get a quote

Book your free site visit

Send a quick enquiry and John will be in touch to arrange a time that suits you.

Free site visit, no obligation. Prefer to talk? Call John on 07935 059311.

Ardingly, Haywards Heath